Nederlands zeeschip na uitval motor gestrand
Grounding on St. Lawrence River
On June 21, 2017, the 'Flevoborg' ran aground on the St. Lawrence River
in front of Sainte-Croix in Lotbinière on the south side of the fairway
The ship was coming from Montreal, where it had sailed at 7.15 a.m.
carrying a cargo of maize, and was heading eastwards bound to Warrenpoint,
when the engines failed and it got stuck
The vessel did not interfere with passing ship traffic
With the help of tugs, the rising tide and pumping water from the ballasts tanks,
the ship managed to refloat by itself in the early evening
As the engines were still not working, the 'Flevoborg' was towed to Quebec
for repairs, where it berthed around 11.30 p.m - Vesseltracker.com
Eerder bij aankomst in de Eemshaven
FLEVOBORG
Bouwjaar 2010, imonummer 9419292, grt 8911
Eigenaar Scheepvaartonderneming Flevoborg B.V., Delfzijl
Manager Wagenborg Shipping B.V., Delfzijl
Gebouwd Ferus Smit GmbH, Leer / 392
LxBxH 156.60 x 17.20 x 11.55 meter
Vermogen 6118 pk, snelheid 15.0 knoop, roepsein PBMH
© Marcel Mos